Every window measured off the drawings. Every floor tracked to install.
Your measure techs tap the window on the plan, log width, height and chain side, and send the floor to your shop. You see every job, every floor, every unit, right on your phone.
Pilot from $4,000Live in about a weekBring one job
Tap Measure. The plan lights up the window.
This is how your techs measure in the app. Every window on the floor is loaded from the drawings and tagged. The one being measured lights up, so nobody measures the wrong opening.
Sample drawing and demo data. On your pilot, we load your real drawings.
Want to see your own building tagged like this? Send the drawings and we'll show you on the call.
Book a 15-min callEvery opening, tracked the way a super tracks a tower.
This is the real app. Level 9 gets measured right off the drawings, then goes to the shop, the truck and the install. Tap a step to jump to it.
Your margin leaks between the field and the shop.
Wrong sizes, floors that aren't ready, and nobody sure what's done. Here's what that costs the industry.
a week that construction pros spend looking for info, fixing mistakes and sorting out conflicts. That's about a third of the week.
FMI / PlanGrid, 2018 study 1of rework on U.S. jobs comes from bad project data and miscommunication. About $31 billion a year.
FMI / PlanGrid, 2018 study 1contractors still keep project data mostly on paper or in spreadsheets.
Procore / Censuswide, 2023 2Do more with the crew you have.
Good installers are hard to find, and most get paid by the piece. Ready floors and right sizes mean more units a day, for them and for you.
- Right sizes the first time. Each width and height is checked against the drawing before anything is cut.
- Chain or motor side on every window. No more guessing at install.
- Fabric, color and mount set once per floor. Your techs only type the sizes.
- Comeback units tracked. Units you can't get into stay on the list until they're measured.
- Cut list by floor and drawing ID. The shop builds in the order your crew installs.
- Installed or Problem, with a photo. Backcharges you can fight.
of construction firms that are hiring say it's hard to find qualified workers.
AGC / NCCER, 2025 3more output per installer when auto-glass installers moved to piece pay. About half came from attracting and keeping better installers.
Lazear, American Economic Review, 2000 4What is chasing status costing you?
Move the sliders to match your company. This is your own estimate, not a promise.
hours a year back for your company
a year in office time, before counting fewer remakes or faster installs
Based on 50 working weeks.
Show me this on my numbersWhat owners say.
“My owner dashboard tells me everything I need to know without making a single call. I'm saving about 15 hours a week, my margins are better, and production from my guys has gone up tremendously.”
“Josh organized our leads, got our jobs scheduled, and gave us a better way to manage our staff. We run more efficiently and our margins are up.”
Straight pricing. Live in about a week.
One setup fee, then a monthly fee. We load your drawings and train your crew.
Pilot
One building. Every window loaded from your drawings. Crew and owner views live in about a week.
Start with one buildingCompany
All your active jobs, your branding, and training for your PMs and crews.
New-tower leads and GC outreach
We find new towers from public permit and planning records, and write intro emails to the GC for you to send. We only do this for one company per trade in each state, so your competitors can't get the same leads.
Built from the GC's side of the table.
Built by a GC superintendent: know the play before it's called.
I'm Joshua Tianga, a superintendent on 25-story residential towers for some of the largest GCs in Florida. I track subs floor by floor every day. Dynasty Ops gives your company the same view, so you know what the GC is going to ask before he asks it.
What owners ask first
Do my crews need to be good with tech?
No. They tap a floor, type a few numbers, and hit save. It works in English or Spanish on any phone.
How long does setup take?
About a week for a pilot building. We load your drawings, set up your people, and train your PMs and crew leads.
What do I have to do?
Send the drawings for one building and give us 30 minutes of your PM's time. We do the rest.
Does it work with motorized shades?
Yes. Pick chain, motor or wand once for the floor, and the side for each window.
Is my data private?
Each company only sees its own jobs, under its own login. We don't sell or share your data. See our privacy policy.
Is there a long contract?
No. The pilot covers one building. If it works for you, we move all your jobs over. If it doesn't, you don't continue.
Why one company per trade for the leads add-on?
So the leads are worth something. If every company in your trade got the same list, nobody would get ahead.
15 minutes to see if it fits your shop.
Pick a day and time. Bring one job you're running now and we'll show you what it looks like on the board.